TY - JOUR AU - Abdul Latif AU - Lady Fitriana AU - Muhammad Firdaus PY - 2021/02/02 Y2 - 2024/03/29 TI - COMPARATIVE ANALYSIS OF SOFTWARE EFFORT ESTIMATION USING DATA MINING TECHNIQUE AND FEATURE SELECTION JF - JITK (Jurnal Ilmu Pengetahuan dan Teknologi Komputer) JA - jitk VL - 6 IS - 2 SE - Articles DO - 10.33480/jitk.v6i2.1968 UR - https://ejournal.nusamandiri.ac.id/index.php/jitk/article/view/1968 AB - Software development involves several interrelated factors that influence development efforts and productivity. Improving the estimation techniques available to project managers will facilitate more effective time and budget control in software development. Software Effort Estimation or software cost/effort estimation can help a software development company to overcome difficulties experienced in estimating software development efforts. This study aims to compare the Machine Learning method of Linear Regression (LR), Multilayer Perceptron (MLP), Radial Basis Function (RBF), and Decision Tree Random Forest (DTRF) to calculate estimated cost/effort software. Then these five approaches will be tested on a dataset of software development projects as many as 10 dataset projects. So that it can produce new knowledge about what machine learning and non-machine learning methods are the most accurate for estimating software business. As well as knowing between the selection between using Particle Swarm Optimization (PSO) for attributes selection and without PSO, which one can increase the accuracy for software business estimation. The data mining algorithm used to calculate the most optimal software effort estimate is the Linear Regression algorithm with an average RMSE value of 1603,024 for the 10 datasets tested. Then using the PSO feature selection can increase the accuracy or reduce the RMSE average value to 1552,999. The result indicates that, compared with the original regression linear model, the accuracy or error rate of software effort estimation has increased by 3.12% by applying PSO feature selection ER -