(1)
APPLICATION OF NON-PREEMPTIVE PRIORITY SCHEDULING METHOD FOR WORK ORDER SCHEDULING SYSTEM. jitk 2025, 10 (3), 698-709. https://doi.org/10.33480/jitk.v10i3.5610.