[1]
“APPLICATION OF NON-PREEMPTIVE PRIORITY SCHEDULING METHOD FOR WORK ORDER SCHEDULING SYSTEM”, jitk, vol. 10, no. 3, pp. 698–709, Feb. 2025, doi: 10.33480/jitk.v10i3.5610.